• Home
  • Member Info
    • Documents
    • Budget
    • Assessments & Maintenance
    • Lake Pickett
    • Dues & Meeting Minutes
    • Architectural Process
  • Projects
  • Contacts
    • Board Members
    • Links
    • Non Owner Contact
    • Estoppel Request
  • PHASE II&III
  • PHASE IV
  • More
    • Home
    • Member Info
      • Documents
      • Budget
      • Assessments & Maintenance
      • Lake Pickett
      • Dues & Meeting Minutes
      • Architectural Process
    • Projects
    • Contacts
      • Board Members
      • Links
      • Non Owner Contact
      • Estoppel Request
    • PHASE II&III
    • PHASE IV
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Member Info
    • Documents
    • Budget
    • Assessments & Maintenance
    • Lake Pickett
    • Dues & Meeting Minutes
    • Architectural Process
  • Projects
  • Contacts
    • Board Members
    • Links
    • Non Owner Contact
    • Estoppel Request
  • PHASE II&III
  • PHASE IV

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Pickett Downs Phase I

Pickett Downs Phase IPickett Downs Phase IPickett Downs Phase I

2021 projects

Road Signs:

  • New  Horse Rider Signs 
  • New Street Signs at all Intersections
  • New Speed Limit Signs



previous years Projects

 Member's Work Day - May 2nd and 3rd. Meet at Bob Morgan's place (1576 Sultan Circle) for coffee and doughnuts at 8:30AM. We will be cleaning and painting the masonry walls at both entrances and picking up trash around the neighborhood.

  • Saturday is clean and prep he walls.
  • Sunday is painting the walls.
  • If you have a pressure washer contact Lisa Surmacz, all other tools will be provided.


  • PROJECT 1 -- Road Maintenance and Repaving
    The Road Committee has finished their report and obtained bids for the project and provided recommendations and costs to the HOA membership. The HOA voted on March 18th to proceed with repaving all of the remaining roads at the same time but without the concrete curbing. Details of the work scope will be provided shortly.


  • PROJECT 2 -- Repair fence stone pillars, paint entrance walls
    Several of the stone pillars or columns that separate the wood fence sections are damaged. The stones have fallen out and, in most cases, are laying next to the columns. These need to be cemented back in place. Additionally, the stucco wall sections need to be repainted.
     
  • PROJECT 3 -- Drainage
    We need to verify main drainage easements are maintained. This includes checking the condition of Silcox Branch Creek and determining the identity of responsible party for its maintenance. Heavy rains may cause flooding if the drainage easements in both Pickett Downs and the Silcox Branch are not maintained at the proper grades. Maintenance includes keeping growth (trees, etc.) in the easements to a minimum and periodically dredging the easements.


  • Home
  • PHASE II&III
  • PHASE IV

Pickett Downs Phase I

Copyright © 2023 Pickett Downs Phase I - All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept